This PR fixes a false positive PONG 'to' endpoint mismatch seen in hive tests:
got {IP:172.17.0.7 UDP:44025 TCP:44025}, want {IP:172.17.0.7 UDP:44025 TCP:0}
Co-authored-by: Felix Lange <fjl@twurst.com>
Some tests take quite some time during exit, which I think causes
some appveyor fails like this:
https://ci.appveyor.com/project/ethereum/go-ethereum/builds/39511210/job/xhom84eg2e4uulq3
One of the things that seem to take time during exit is waiting
(up to 100ms) for the syncbloom to close. This PR changes it to use
a channel, instead of looping with a 100ms wait.
This also includes some unrelated changes improving the reliability of
eth/fetcher tests, which fail a lot because they are time-dependent.
This commit adds the package gethclient which is similar to the ethclient
and implements some geth specific functionality.
Co-authored-by: Edgar Aroutiounian <edgar.factorial@gmail.com>
Co-authored-by: Felix Lange <fjl@twurst.com>
This fixes transaction sending in the case where an app using go-ethereum v1.10.4
is talking to a pre-EIP-1559 RPC node. In this case, the eth_maxPriorityFeePerGas
endpoint is not available and we can only rely on eth_gasPrice.
* core,eth/tracers: make isPrecompiled dependent on HF
* eth/tracers: use keys when constructing chain config struct
* eth/tracers: dont initialize activePrecompiles with random value
This change increases the cache size from 64 to 256 Mb for block bodies.
Benchmarks have shown this to be one bottleneck when trying to achieve
higher download speeds.
The commit also includes a minor optimization for header inserts in package
core: previously, the presence of headers in the database was checked for
every header before writing it. With the change, if one header fails the
presence check, all subsequent headers are also assumed to be missing.
This is an improvement because in practice, the headers are almost always
missing during sync.
Previously, the test waited a second and then failed if geth had not
started. This caused the test to fail intermittently. This change checks
whether the IPC is open 10 times over a 5 second period and then fails
if geth is still not available.
The `README.md` links the Gitter channel for discussions, but the
official docs and even the Gitter channel itself recommend using the
official Discord Server for such discussions.
This PR simply changes the Gitter link and provides Discord invite link.
When deleting in fullNode, and the new child node nn is not nil, there is no need
to check the number of non-nil entries in the node. This is because the fullNode
must've contained at least two children before deletion, so there must be another
child node other than nn.
Co-authored-by: Felix Lange <fjl@twurst.com>