Commit Graph

7 Commits

Author SHA1 Message Date
c77b42fa95 Refactor Eth1BlockHash to the more specific Eth1DataBlockHash to avoid ambiguity. 2022-09-19 16:39:12 -05:00
Abdul Rabbani
24fc6358d6
Testing for Batch Processing (#56)
* Set starting slot and improve error gap capturing

* Set starting slot and improve error gap capturing

* Tests + Significant Refactor

The code for historical processing has been significantly refactored to use a context to signify a shutdown.

There have also been many tests added for historical and knownGaps processing.

* Update MhKeys in test

* Update correct values

* Update Max Retry

Genesis is not working as expected.

* Ensure we release locks properly

* Add ordered testing

* Include system tests

* Update workflow calls

* Add secrets

* Add required secrets

* update path

* Try using the absolute path

* Remove volumes at the end.

* Update system-tests.yml

* Update system-tests.yml

* Update test err

* Update and test the shutdown

* rename ethcl --> eth-beacon

* Try forcing /bin/bash for docker-compose

* Update system-tests.yml

* Update system-tests.yml

* Update system-tests.yml

* Update system-tests.yml

* Update system-tests.yml

* Update system-tests.yml

* Use single quote cron

* Dont run generic on schedule
2022-06-09 17:32:46 -04:00
Abdul Rabbani
891f4c7ef3 Update Vulcanize License in a .go files 2022-05-18 12:12:54 -04:00
Abdul Rabbani
a31c9226ec Handle Skipped Slots (#34)
* Ensure that the node is synced at boot time

* Update test + add logic for checking skipped slots

* Update boot check

* Add skip_sync to config.

* Update a test so it fails
2022-05-17 16:45:40 -04:00
Abdul Rabbani
12675f85c2 Add KnownGaps Errors (#33) 2022-05-17 16:45:40 -04:00
Abdul Rabbani
d13144ca90 Capture the head block in the DB entirely. (#27)
* -- Intermediary Commit --

Just want to commit my code over the weekend, in case I spill coffee on my workstation.

* Create DB models ready for write.

* Handle SSE events

* Update ref for stack-orchestrator

* Use env in one place only.

* Boot Application on PR

* Update syntax

* Update syntax

* Correct command

* Use bash instead of sh

* Use until instead of while

* Make linter happy and check sse subscription err

* Handle Reorgs - Untested
2022-05-17 16:45:40 -04:00
Abdul Rabbani
87313887a4 Graceful Shutdown | Handle SSE | Requires Testing
This Commit contains the following:
* Graceful shutdowns.
* Handling all incoming SSE events for reorgs, finalizations, and head.

The structure of the `BeaconClient` has drastically changed and generics are used.
2022-04-26 13:57:01 -04:00