This migrates everything except the `go-car` librairy: https://github.com/ipfs/boxo/issues/218#issuecomment-1529922103
I didn't migrated everything in the previous release because all the boxo code wasn't compatible with the go-ipld-prime one due to a an in flight (/ aftermath) revert of github.com/ipfs/go-block-format. go-block-format has been unmigrated since slight bellow absolutely everything depends on it that would have required everything to be moved on boxo or everything to optin into using boxo which were all deal breakers for different groups.
This worked fine because lotus's codebase could live hapely on the first multirepo setup however boost is now trying to use boxo's code with lotus's (still on multirepo) setup: https://filecoinproject.slack.com/archives/C03AQ3QAUG1/p1685022344779649
The alternative would be for boost to write shim types which just forward calls and return with the different interface definitions.
Btw why is that an issue in the first place is because unlike what go's duck typing model suggest interfaces are not transparent https://github.com/golang/go/issues/58112, interfaces are strongly typed but they have implicit narrowing. The issue is if you return an interface from an interface Go does not have a function definition to insert the implicit conversion thus instead the type checker complains you are not returning the right type.
Stubbing types were reverted https://github.com/ipfs/boxo/issues/218#issuecomment-1478650351
Last time I only migrated `go-bitswap` to `boxo/bitswap` because of the security issues and because we never had the interface return an interface problem (we had concrete wrappers where the implicit conversion took place).
* Fix 1.21 regression: GET_32G_MAX_CONCURRENT + mixed prepared/executing leads to stuck scheduler
If you have 12 GET tasks and GET_32G_MAX_CONCURRENT=1, sealing jobs will only show assigned tasks for GET of the miner
and is stuck.
I believe this to be a regression of 1.21 unifying the counters, in the case of GETs where PrepType and TaskType
both being seal/v0/fetch leading to a state where tasks are blocked since already counted towards the limit.
* itests: Repro issue from PR #10633
* make counters int (non-working)
* fix: worker sched: Send taskDone notifs after tasks are done
* itests: Make TestPledgeMaxConcurrentGet actually reproduce the issue
* make the linter happy
---------
Co-authored-by: Steffen Butzer <steffen.butzer@outlook.com>
* Make lotus-worker report GPU usage to miner during ReplicaUpdate task
* make gen
---------
Co-authored-by: Jacob Crowther <jcrowthe@users.noreply.github.com>