laconicd-deprecated/docs/architecture/PROCESS.md

57 lines
3.0 KiB
Markdown
Raw Normal View History

# ADR Creation Process
1. Copy the `adr-template.md` file. Use the following filename pattern: `adr-next_number-title.md`
2. Create a draft Pull Request if you want to get an early feedback.
3. Make sure the context and a solution is clear and well documented.
4. Add an entry to a list in the [README](./README.md) file.
5. Create a Pull Request to propose a new ADR.
## ADR life cycle
ADR creation is an **iterative** process. Instead of trying to solve all decisions in a single ADR pull request, we MUST firstly understand the problem and collect feedback through a GitHub Issue.
1. Every proposal SHOULD start with a new GitHub Issue or be a result of existing Issues. The Issue should contain just a brief proposal summary.
2. Once the motivation is validated, a GitHub Pull Request (PR) is created with a new document based on the `adr-template.md`.
2022-10-10 10:38:33 +00:00
3. An ADR doesn't have to arrive to `master` with an *accepted* status in a single PR. If the motivation is clear and the solution is sound, we SHOULD be able to merge it and keep a *proposed* status. It's preferable to have an iterative approach rather than long, not merged Pull Requests.
2022-10-10 10:38:33 +00:00
4. If a *proposed* ADR is merged, then it should clearly document outstanding issues either in ADR document notes or in a GitHub Issue.
2022-10-10 10:38:33 +00:00
5. The PR SHOULD always be merged. In the case of a faulty ADR, we still prefer to merge it with a *rejected* status. The only time the ADR SHOULD NOT be merged is if the author abandons it.
6. Merged ADRs SHOULD NOT be pruned.
### ADR status
Status has two components:
```
{CONSENSUS STATUS} {IMPLEMENTATION STATUS}
```
IMPLEMENTATION STATUS is either `Implemented` or `Not Implemented`.
#### Consensus Status
```
DRAFT -> PROPOSED -> LAST CALL yyyy-mm-dd -> ACCEPTED | REJECTED -> SUPERSEDED by ADR-xxx
\ |
\ |
v v
ABANDONED
```
+ `DRAFT`: [optional] an ADR which is work in progress, not being ready for a general review. This is to present an early work and get an early feedback in a Draft Pull Request form.
+ `PROPOSED`: an ADR covering a full solution architecture and still in the review - project stakeholders haven't reached an agreed yet.
+ `LAST CALL <date for the last call>`: [optional] clear notify that we are close to accept updates. Changing a status to `LAST CALL` means that social consensus (of Cosmos SDK maintainers) has been reached and we still want to give it a time to let the community react or analyze.
+ `ACCEPTED`: ADR which will represent a currently implemented or to be implemented architecture design.
+ `REJECTED`: ADR can go from PROPOSED or ACCEPTED to rejected if the consensus among project stakeholders will decide so.
+ `SUPERSEEDED by ADR-xxx`: ADR which has been superseded by a new ADR.
+ `ABANDONED`: the ADR is no longer pursued by the original authors.
## Language used in ADR
+ The context/background should be written in the present tense.
2022-10-10 10:38:33 +00:00
+ Avoid using a first, personal form.