Commit Graph

2 Commits

Author SHA1 Message Date
Abdul Rabbani
13ada14860 Update paths for GHA 2022-04-25 10:47:05 -04:00
Abdul Rabbani
90cb1d3414
Boot application with tests (#14)
* Update cobra to require `head` or `historic` when using `capture`.

* A very generic package for implementing PGX driver

I copied most of the code from the `statediff` service from within geth. The idea is that I can create formal DB packages, that can be utilized in other projects down the road.

* Put PGX and other future Postgres Drivers behind SQL package

This PR makes allows users to provide a config, along with a driver string. It will then provide the respective driver.

* Add DB Connection and Logging

* Utilize LogRus
* Create a DB connection using PGX.
* Create an internal boot package for starting the application.

* Code clean up + Beacon Chain Connection

This concludes all the code needed to connect to the DB and beacon node. We will no longer reference the lighthouse client because this application should work interchangeably with any beacon node.

I have also standardized logging.

* Last second clean ups

* Utilize Ginkgo toreplace `testing` library, and add CI/CD. (#9)

* Utilize Ginkgo and replace `testing` library.

* Add TOC to docs

* Add Docker specific files

* Remove -e

* Update on-pr-manual.yml

* Add depth

* Add repositories

* Remove $ from path

* Update path for make

* Setup Go and Ginkgo

* Use go mod download

* Use go install

* Update on-pr-manual.yml

* Use latest

* Remove install of GINKGO

* Add explicit gopath

* Explicitly specify the gopath

* Update on-pr-manual.yml

* Update on-pr-manual.yml

* Update on-pr-manual.yml

* Update on-pr-manual.yml

* Update on-pr-manual.yml

* Update on-pr-manual.yml

* Use which ginkgo

* Try with make now

* Final working Make

* Feature/11 testing add tests for boot (#12)

* Utilize Versioning

* Update Testing and CI/CD

* Update Testing

* Add Linting and Remove timeout

* Update Lint

* handle errors to make the linter happy

* Utilized interfaces for DB

* Update Manual Testing CI/CD

* Try combining everything into one pipeline (#13)

* Try combining everything into one pipeline

* Update on-pr-manual.yml

* Remove PAth for testing

* Combine single YML workflow file for PR

* Add a comment
2022-04-22 17:12:10 -04:00